A robot will soon try to remove melted nuclear fuel from Japan's destroyed Fukushima reactor

travel2024-05-29 13:01:037918

TOKYO (AP) — The operator of Japan’s destroyed Fukushima Daiichi nuclear power plant demonstrated Tuesday how a remote-controlled robot would retrieve tiny bits of melted fuel debris from one of three damaged reactors later this year for the first time since the 2011 meltdown.

Tokyo Electric Power Company Holdings plans to deploy a “telesco-style” extendable pipe robot into Fukushima Daiichi No. 2 reactor to test the removal of debris from its primary containment vessel by October.

That work is more than two years behind schedule. The removal of melted fuel was supposed to begin in late 2021 but has been plagued with delays, underscoring the difficulty of recovering from the magnitude 9.0 quake and tsunami in 2011.

During the demonstration at the Mitsubishi Heavy Industries’ shipyard in Kobe, western Japan, where the robot has been developed, a device equipped with tongs slowly descended from the telescopic pipe to a heap of gravel and picked up a granule.

Address of this article:http://monaco.shellye-mcdaniel.com/html-27c499480.html

Popular

Father of North Carolina House Speaker Tim Moore dies at 75

8 shot, 2 men killed at a party in Memphis park

Scott Dixon stretches fuel to inch closer to A.J. Foyt on IndyCar's all

Casey Mize throws 6 shutout innings for 1st win since 2021 as Tigers beat Twins 6

Indianapolis officer fatally shoots suspect in armed carjacking after suspect reaches for something

Caroline Flack's best

Will there be a 'superbloom' this year in California? Here's what to know

Olympic champion Jepchirchir wins women's race at London Marathon

LINKS